Archive of UserLand's first discussion group, started October 5, 1998.
Following the directions to setup DG, get an error...
Author: erik Posted: 4/13/1999; 5:14:46 PM Topic: Following the directions to setup DG, get an error... Msg #: 4997 Prev/Next: 4996 / 4998
I'm reading http://frontier.userland.com/tree$3.2.6.2 and following every step exactly. Many things work, but when I go to the main entrypoint for the DG (#url = discussHomepage, which I've tried both htmlInterfaces/ and my cloned copy of that), I get the following error:"Can't get the first day in the calendar because adrcalendar doesn't point to a valid non-empty calendar structure. "
Oddly, no one else talks about getting this error. How does one get the calendar ball rolling? Must you intialize a DG a certain specific way?
When I do the newTopic page, I can enter a topic and that works. The response works too. But then going to list topics, I get the error "Can't find a sub-table named item#1."
There are responses to this message:
- Re: Following the directions to setup DG, get an error..., André Radke, 4/13/1999; 7:05:52 PM
This page was archived on 6/13/2001; 4:49:21 PM.
© Copyright 1998-2001 UserLand Software, Inc.